Tag Archives: Ontario Build Code & hotel designs

The Sheraton Centre Hotel is renovating in Toronto. Will this be ACCESSIBLE?

Which consulting firm will Sheraton Centre use to ensure all of the Ontario Build Code Barrier Free Design elements are in place. Jan 1st 2015 (45 days from today) is the deadline for commencement of use of the OBC ABES design + the IASR (AODA) mandatory requirements for public space accessible design and outdoor public […]